PHASE I OF POWERCO GIGAFACTORY (VOLKSWAGEN GROUP) IN SAGUNTO, VALENCIA (SPAIN)

 

> Surface: 257,000 m²

 

> Buildings: 5

 

> Electromechanical and plumbing installations in 5 buildings (FIDIC Red) and the EPC (Engineering, Procurement, and Construction) for the installation of climate control production facilities (FIDIC Silver) at the Energy Centre.

 

Within the battery manufacturing plant in Sagunto, the contracted works and activities are essential and key to the development of the facility itself. This factory, currently being developed in its first phase, covers an area of over 250,000 square metres, positioning itself as one of the largest battery manufacturing plants in Spain and among the most important in Europe.

 

The activities to be carried out include the entire production of cold and chilled water, which serves the entire industrial process, as well as Medium and Low Voltage installations for battery production, alongside conventional electromechanical installations (Fire Protection, PA system, ventilation, extraction, Nitrogen, compressed air, Helium, and other gases). The works also involve the supply and installation of auxiliary facilities for all contractors.